Compliance Results
Full SANS 10400-XA compliance report and component analysis.
Project Details
Component Compliance Status
Summary Report
Complete Report (All Components)
1) Project Basics
2) Orientation
—Orientation (primary façade)
Choose: North, North-East, East, South-East, South, South–West, West, North-West.
| # | Storey | Orientation | Note |
|---|
3) Fenestration (Table 4)
—Windows / Doors
Implements SANS 10400‑XA Table 4 per storey. For each floor we compute glazing %, then apply U‑value and SHGC limits.
4) Shading (Table 3)
—Shading (XA 5.2 compliance)
For overhangs/canopies, projection P must be at least H × multiplier (latitude dependent).
| # | Floor | Window | Orientation | Width (m) | Height (m) | Method | H (m) | P (entered) (m) | Multiplier | Required P | Actual P | P/H | Status |
|---|
5) Roof
—Roof assembly designer (Table 8 logic)
| Product (generic) | λ (W/m·K) | Recommended thickness (mm) |
|---|
| # | Material | λ | Thickness (mm) | R (m²·K/W) |
|---|
Designed added insulation R: 0.00 m²·K/W
6) Walls
—SANS 10400-XA Walls — R & CR Compliance
Calculates total R-value, surface density, and CR-value.
1) Project & Compliance Context
2) Wall Assembly (inside → outside)
| Layer | t (mm) | k (W/m·K) | ρ (kg/m³) | c (kJ/kg·K) | R (m²·K/W) | mass (kg/m²) | C (kJ/m²·K) |
|---|
3) Results & Compliance
7) Floors
—SANS 10400‑XA — Floors
1) Project context
2) Insulation R‑values
| Assembly | Insulation R (m²·K/W) | Requirement | Status |
|---|---|---|---|
| Heated slab (underfloor heating present) |
or
Helper: R = t/1000 ÷ k
|
— | — |
| Suspended floor (envelope) |
or
Helper: R = t/1000 ÷ k
|
— | — |
8) Rooflights
—Roof lights / skylights — Table 5 compliance
Checks the rooflight‑to‑room floor area ratio and applies Table 5 bands for U and SHGC. If the ratio is < 1.5%, “any solution” applies.
| Band | Max ratio (%) | U ≤ | SHGC ≤ |
|---|
9) Energy — Lighting
—Lighting — Single Occupancy
Checks LPD ≤ Table 12 (SANS 10400‑XA 6.2).
| # | Type | W/fixture | Qty | Total W | Remove |
|---|
| # | Type | W/fixture | Qty | Total W | Remove |
|---|
10) Hot-Water
—Domestic hot-water — Demand & Compliance (XA §6.1)
1) Project context
2) Technology & supply split (XA §6.1)
4) Minimum storage (Table 10 — editable)
5) Pipe insulation (exposed)
| Run | Location | Length (m) | Thickness (mm) | k (W/m·K) | R-proposed | R-min (Table 11) | Status |
|---|